Tag: Flooring

Updated Living Room

In the property Nigel removed the fireplace and blocked up the opening creating a cosy separate living room, sound proof plasterboard was fitted to the internal wall and the whole room was skimmed, he then fitted new skirting boards and arranged for a carpenter to fit the door.

Living-Room-B&A

Conservatory Update

Traditional conservatories tend to be hot in the summer and cold in the winter.

These customers had the glass roof replaced with an insulated “slate tile one”, Nigel fitted insulated boards to the bare brick walls, removed the old aluminium patio doors  and plastered the whole area

The result is fantastic they now have a room which can be used in the winter and summer and is part of the house.

Tiling completed by R Darlington Tiling

conservatory before

After old patio doors had been removed

conservatory after

Conservatory after plastering

conservatory after 2

Complete Kitchen Renovation

Before

Kitchen-Before

After

Kitchen-After

Nigel completed renovated this kitchen. He replaced the cupboard doors, hung the wall cupboards and fitted an extractor fan. He then fitted the fridge/freezer unit and finished the job by tiling the walls and floor.

© Nigel Clowes Plastering Services 2016

Up ↑